{"id":75892,"date":"2022-10-31T10:48:41","date_gmt":"2022-10-31T02:48:41","guid":{"rendered":"https:\/\/www.tm-robot.com\/?post_type=docs&p=75892"},"modified":"2023-04-21T11:27:09","modified_gmt":"2023-04-21T03:27:09","slug":"waitfor-node-multiple-condition-is-union-or-intersection","status":"publish","type":"docs","link":"https:\/\/www.tm-robot.com.cn\/zh-hans\/docs\/waitfor-node-multiple-condition-is-union-or-intersection\/","title":{"rendered":"WaitFor node multiple condition is Union or Intersection?"},"content":{"rendered":"
Examples are valid for:\r\nTMflow Software version: 1.76.6300 or above.\r\nTM Robot Hardware version: All versions.\r\nNote that older or newer software versions may have different results.<\/pre>\n
\n

The main function of the WaitFor<\/b> Node is to hold the project, and continue to run after the set conditions are met. It can be set according to IO<\/b>, Time<\/b>, Variables <\/b>and other conditions to judge whether to resume the run.<\/p>\n